Your present location:Home >> History
  • 2014

    In October, 2014, Phase IV project started construction. Phase IV mainly includes: 200,000 tons/year CO2 recovery project, 20000 ton/day waste water emission reduction and water reuse project and mixed solvent project with an annual output of 40,000 tons.

  • 2012

    On October, 1, 2012, 50,000-ton alcohol technical reform and relocation of Jinshan Chemical Engineering and the supporting acetaldehyde device with the annual output of 40,000 tons was completed and put into operation.

  • 2012

    In April, 2012, 100,000-ton device, second phase of acetic acid ethyl ester (TBP) device with an annual output totaling 200,000 tons, was completed and put into operation.

  • 2011

    On October, 27, 2011, third phase of project was commenced. Phase III project of Jinmaoyuan covers: 100,000-ton device, second phase of acetic acid ethyl ester (TBP) device with an annual output of 200,000 tons, 50,000-ton alcohol technical reform and relocation of Jinshan Chemical Engineering, and ethanol device with annual output of 40,000 tons.

  • 2009

    On April, 16, 2009, first phase of device of acetic acid ethyl ester (TBP) with annual output of 100,000 tons was completed and put into commissioning. On October, 1, 2009, 70,000-ton liquor-free device was completed and put into commissioning.

  • 2008

    On December, 10, 2008, Phase I project broke ground. Phase I project of Jinmaoyuan mainly incorporates: 100,000-ton device, first phase of acetic acid ethyl ester (TBP) device with output 200,000 tons and anhydrous alcohol device with annual output of 70,000 tons.

  • 2008

    On January, 10, 2008, ethyl ester project opened feed intake and produced qualified products on the 12th. On January, 27, 2008, n-butyl alcohol opened feed intake. On February, 2, it produced qualified products and all projects of Phase I showed success in their first operation.

  • 2007

    On October, 18, 2007, the pyoelectricity boiler was ignited. Less than one year, a modernized biochemical engineering company was established in Haizhou Bay by the Yellow Ocean. As Phase-I projects were completed, the Company carried out solo test run and linkage test run of the equipment.

  • 2006

    In November, 2006, it broke ground. Phase I project of Jinmaoyuan covers the following main projects: ethyl ester with an annual output of 100,000 tons; n-butyl alcohol mixed solvent with output of 40,000 tons, DDG protein feed with output of 30,000 tons, 6MW marsh gas combined heat and power generation and sewage disposal utilities with a daily disposal amount totaling 20,000 tons and other public utility projects.

  • 2005

    At the end of 2005, as was approved by Linshu county Party committee and Linshu county government, Jiyiment Group decided to invest 2 billion Yuan to relocate Jiangsu Jinshan Fertilizer Co., Ltd. to Haizhou Bay Biological Science and Technology Park in Ganyu County, Jiangsu. On July, 9, 2006, Jinyimeng Group registered and founded Jiangsu Jinmaoyuan Biochemical Engineering Co., Ltd. to implement designing of general drawing and Phase-I project of Jinmaoyuan.